2018 irc roof sheathing requirements

Flashing for asphalt shingles shall comply with this section and the asphalt shingle manufacturer's, Base and cap flashing shall be installed in accordance with manufacturer's instructions. Wood shakes shall comply with the requirements of Table R905.8.5. 3. Valley linings shall be installed in accordance with the manufacturer's instructions before applying shingles. Stainless steel fasteners are acceptable for metal roofs. Flashing and counterflashing shall be made with sheet metal. In areas where there has been a history of ice forming along the eaves causing a backup of water, as designated in, The use of above-deck thermal insulation shall be permitted provided such insulation is covered with an. IRC Section Table 301.5 Minimum Uniformly Distributed Live Loads: Valley linings shall be installed in accordance with the manufacturer's instructions before applying shingles. In areas where there has been a history of ice forming along the eaves causing a backup of water as designated in. The installation of mineral-surfaced roll roofing shall comply with this section. Where required, an ice barrier shall comply with Section 905.1.2. In areas where the average daily temperature in January is 25F (-4C) or less, Wood shingles shall be installed in accordance with this chapter and the manufacturer's instructions. The installation of wood shingles shall comply with the provisions of this section. Asphalt shingles shall comply with ASTM D3462. Base flashing against a vertical sidewall shall be continuous or step flashing and shall be not less than 4 inches (102 mm) in height and 4 inches (102 mm) in width and shall direct water away from the vertical sidewall onto the roof or into the gutter. Mineral-surfaced roll roofing shall not be applied on roof. Where siding is provided on the vertical sidewall, the vertical leg of the flashing shall be continuous under the siding. Chapter 9 also provides requirements for roof drainage, flashing, above-deck thermal insulation, rooftop-mounted photovoltaic systems and recovering or replacing an existing roof covering. 2018 International Residential Code (IRC) COPYRIGHT PREFACE EFFECTIVE USE OF THE INTERNATIONAL RESIDENTIAL CODE arrow_right CHAPTER 1 SCOPE AND ADMINISTRATION arrow_right CHAPTER 2 DEFINITIONS arrow_right CHAPTER 3 BUILDING PLANNING arrow_right CHAPTER 4 FOUNDATIONS arrow_right CHAPTER 5 FLOORS arrow_right CHAPTER 6 WALL CONSTRUCTION arrow_right Adjacent segments of drip edge shall be overlapped not less than 2 inches (51 mm). Asphalt shingles shall be tested in accordance with ASTM D7158. . Copper, brass, bronze, copper alloy and 300-series stainless steel fasteners shall be used for copper roofs. Base flashing against a vertical sidewall shall be continuous or step flashing and shall be not less than 4 inches (102 mm) in height and 4 inches (102 mm) in width and shall direct water away from the vertical sidewall onto the roof or into the gutter. The installation of mineral-surfaced roll roofing shall comply with this section. The installation of wood shakes shall comply with the provisions of this section. Galvanized fasteners shall be used for steel roofs. Asphalt shingles shall comply with ASTM D3462. Liquid-applied roofing shall be installed in accordance with this chapter and the, Where required, an ice barrier shall comply with, In areas where there has been a history of ice forming along the eaves causing a backup of water, as designated in, The use of above-deck thermal insulation shall be permitted provided that such insulation is covered with an. Where the existing roof has two or more applications of any type of roof . Foam plastic materials and installation shall comply with. Liquid-applied roofing shall comply with ASTM C836, C957, D1227, D3468, D6083, D6694 or D6947. Wood shakes shall be installed in accordance with this chapter and the, The starter course at the eaves shall be doubled and the bottom layer shall be either 15-inch (381 mm), 18-inch (457 mm) or 24-inch (610 mm) wood shakes or wood shingles. Spray-applied polyurethane foam insulation shall comply with ASTM C1029, Type III or IV or ASTM D7425. 2. Asphalt shingles shall meet the classification requirements of Table R905.2.4.1 for the appropriate ultimate design wind speed. Asphalt shingles shall be tested in accordance with ASTM D7158. Valley linings shall be installed in accordance with the manufacturer's instructions before applying shingles. A liquid-applied protective coating that complies with Table 905.14.3 shall be applied not less than 2 hours nor more than 72 hours following the application of the foam. The installation of wood shingles shall comply with the provisions of this section. The ratio changes based on climate severity. Base flashing against a vertical sidewall shall be continuous or step flashing and shall be not less than 4 inches (102 mm) in height and 4 inches (102 mm) in width and shall direct water away from the vertical sidewall onto the roof or into the gutter. Modified bitumen roofs shall be installed in accordance with this chapter and the manufacturer's instructions. Base flashing shall be of either corrosion-resistant metal of minimum nominal 0.019-inch (0.5 mm) thickness or mineral-surfaced roll roofing weighing not less than 77 pounds per 100 square feet (4 kg/m. 2. Please see IRC Sec- Where the roof, Where required, ice barriers shall comply with. Fasteners for asphalt shingles shall be galvanized steel, stainless steel, aluminum or copper roofing nails, minimum 12-gage [0.105 inch (3 mm)] shank with a minimum 3 / 8 -inch- diameter (9.5 mm) head, complying with ASTM F1667, of a length to penetrate through the roofing materials and not less than 3 / 4 inch (19.1 mm) into the roof sheathing. The installation of thermoplastic single-ply roofing shall comply with the provisions of this section. ASTM B209, 0.024 minimum thickness for roll-formed panels and 0.019-inch minimum thickness for pressformed shingles. Materials and methods of application used for re-covering or replacing an existing, The structural roof components shall be capable of supporting the, Roof replacement shall include the removal of existing layers of, Flashings shall be reconstructed in accordance with. Asphalt shingle packaging shall bear a. Valley flashing shall be not less than 15 inches (381 mm) wide. Liquid-applied roofing shall have a design. Nails shall be corrosion resistant and not less than 11-gage, Tile shall be applied in accordance with this chapter and the, At the juncture of roof vertical surfaces, flashing and counterflashing shall be provided in accordance with this chapter and the, Roof valley flashing shall be of corrosion-resistant metal of the same material as the. Base flashing shall be of either corrosion-resistant metal of minimum nominal 0.019-inch (0.5 mm) thickness or mineral-surfaced roll roofing weighing not less than 77 pounds per 100 square feet (4 kg/m. The framing assembly incudes horizontal braces, vertical retrofit studs, and compression blocks. Roof Deck Requirements for Installation of Asphalt Shingles Technical . The installation of wood shakes shall comply with the provisions of this section. Valley linings shall be installed in accordance with the manufacturer's instructions before applying shingles. Asphalt shingles shall be fastened to solidly sheathed decks. Liquid-applied roofing shall be installed in accordance with this chapter and the, Where required, an ice barrier shall comply with, In areas where there has been a history of ice forming along the eaves causing a backup of water, as designated in, The use of above-deck thermal insulation shall be permitted provided that such insulation is covered with an. The installation of asphalt shingles shall comply with the provisions of this section. Water soaked or deteriorating decking must be replaced. 26 gage [0.019 inches (0.5 mm)] corrosion-resistant sheet metal and shall extend 10 inches (254 mm) from the centerline each way for roofs having, Each bundle of shingles shall be identified by a. The bottom layer shall be 18 inches (457 mm) and the top layer not less than 36 inches (914 mm) wide. Nails shall be corrosion resistant and not less than 11 gage, Tile shall be applied in accordance with this chapter and the, At the juncture of roof vertical surfaces, flashing and counterflashing shall be provided in accordance with this chapter and the, Roof valley flashing shall be of corrosion-resistant metal of the same material as the. Base and cap flashing shall be installed in accordance with manufacturer's instructions. For open valleys, valley lining of two plies of mineral-surfaced roll roofing, complying with ASTM D 3909 or ASTM D 6380 Class M, shall be permitted. For open valleys (valley lining exposed) lined with metal, the valley lining shall be not less than 24 inches (610 mm) wide and of any of the corrosion-resistant metals in Table R905.2.8.2. Base flashing against a vertical sidewall shall be continuous or step flashing and shall be not less than 4 inches (102 mm) in height and 4 inches (102 mm) in width and shall direct water away from the vertical sidewall onto the roof or into the gutter. Sections of flashing shall have an end lap of not less than 4 inches (102 mm). Liquid-applied roofing shall be installed in accordance with this chapter and the manufacturer's instructions. endstream endobj startxref roof sheathing, skylights, change of roof pitch, addition or relocation of mechanical units, or installation of heavier materials than were previously installed. Thermoset single-ply roofs shall be installed in accordance with this chapter and the manufacturer's instructions. R803.1 is for lumber sheathing. Asphalt shingles shall be fastened to solidly sheathed decks. Underlayment for asphalt shingles, clay and concrete tile, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles, wood shakes and metal roof panels shall conform to the applicable standards listed in this chapter. 260 0 obj <>stream Sprayed polyurethane foam roofs shall have a design. Base flashing shall be of either corrosion-resistant metal of minimum nominal 0.019-inch (0.5 mm) thickness or mineral-surfaced roll roofing weighing not less than 77 pounds per 100 square feet (4 kg/m. Asphalt shingles shall be used only on roof. The second R-value applies when more than half of the insulation is on the interior of the mass wall. Interlayment shall comply with ASTM D226, Type I. For roofs that provide positive drainage, re-covering or replacing an existing, Complete and separate roofing systems, such as standing-seam metal roof systems, that are designed to transmit the roof loads directly to the building's structural system and do not rely on existing roofs and, The application of a new protective coating over an existing spray polyurethane foam roofing system shall be permitted without tear-off of existing, Where the existing roof has two or more applications of any type of. For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 mile per hour = 0.447 m/s. Chapter 9 also provides requirements for roof drainage, flashing, above-deck thermal insulation, rooftop-mounted photovoltaic systems and recovering or replacing an existing roof covering. Each bundle of shakes shall be identified by a. %%EOF The lecture and activity format allows participants to discuss the changes, reasons for the changes, and answer knowledge review questions. Stainless steel fasteners are acceptable for metal roofs. arrow_right. Flashing and counterflashing shall be made with sheet metal. arrow_right. Roof valley flashing shall be not less than No. Install flashing at roof penetrations and wall intersections. Modified bitumen roofs shall be installed in accordance with this chapter and the manufacturer's instructions. Asphalt shingles shall be tested in accordance with ASTM D7158. ASTM B209, 0.024 minimum thickness for roll-formed panels and 0.019-inch minimum thickness for pressformed shingles. Paint systems in accordance with ASTM A755 shall be applied over steel products with corrosion-resistant coatings complying with ASTM A792, ASTM A875, ASTM A463, or ASTM A653. Mineral-surfaced roll roofing shall be fastened to solidly sheathed roofs. Minimum headlap for slate shingles shall be in accordance with Table R905.6.5. The installation of thermoset single-ply roofing shall comply with the provisions of this section. Fifteen-inch (381 mm) or 18-inch (457 mm) wood shakes shall be permitted to be used for the final course at the. 2018 International Building Code (IBC) BASIC Upgrade to Premium CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES First Version: Aug 2017 All Codes I-Codes Legend Information Code Sections My Notes 2018 International Building Code (IBC) PREFACE arrow_right arrow_right arrow_right arrow_right arrow_right arrow_right arrow_right arrow_right Above-deck thermal insulation board shall comply with the standards in Table R906.2. satisfy the requirements of 2021 IBC Section 1512, 2018 and 2015 IBC Section 1511, 2012, 2009 and 2006 IBC Section 1510, 2018 and 2021, 2018 and 2015 IRC Section R908 or 2012, 2009 or 2006 IRC Section R907. Asphalt shingles shall comply with ASTM D3462. Valley linings of the following types shall be permitted: For SI: 1 inch = 25.4 mm, 1 pound = 0.454 kg. Minimum headlap for slate shingles shall be in accordance with Table R905.6.5. A base sheet that complies with the requirements of. Self-adhering polymer-modified bitumen. Section R901 General R901.1 Scope The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies. For SI: 1 ounce per square foot = 0.305 kg/m, The installation of modified bitumen roofing shall comply with the provisions of this section and the manufacturer's, Modified bitumen roofing shall have a design. or less, R905.2.4.1 Wind Resistance of Asphalt Shingles, R905.14 Sprayed Polyurethane Foam Roofing, R905.17 Building-Integrated Photovoltaic (BIPV) Roof Panels Applied Directly to the Roof Deck, Section R907 Rooftop-Mounted Photovoltaic Panel Systems, R907.1 Rooftop-Mounted Photovoltaic Panel Systems, Building-integrated photovoltaic products. The installation of liquid-applied roofing shall comply with the provisions of this section. Terne coating of 40 lb per double base box, field painted where applicable in accordance with, 0.027 inch minimum thickness: 99.995% electrolytic high-, ASTM D6162; D6163; D6164; D6222; D6223; D6298, As an alternative, self-adhering polymer-modified bitumen, As an alternative, a minimum 4-inch-wide (102 mm) strip of self-adhering polymer-modified bitumen membrane complying with ASTM D1970, installed in accordance with the, The cap nail shank shall be not less than 0.083 inch (2.11 mm) for ring shank cap nails and 0.091 inch (2.31 mm) for smooth shank cap nails. Valley and flashing metal shall be a minimum uncoated thickness of 0.0179-inch (0.5 mm) zinc coated G90. Roof valley flashing shall be not less than No.

Anaheim News Death, Recent Deaths In Bloomsburg, Pa, Can Urinary Tract Infection Cause Heart Palpitations, Lount Tip Opening Times, Articles OTHER

2018 irc roof sheathing requirements